Calculator
Calcuation of savings for a higher machine availability
pre-condition --> machine is the bottle neck in the scenario (this is 100% the case if you work with a Barcode profile change)
Calcuation of savings for a higher machine availability
pre-condition --> machine is the bottle neck in the scenario (this is 100% the case if you work with a Barcode profile change)
Change per day | ||
Working days a month | days | |
Line cost per hour | €/h | |
One Profile change with temperature change | min (in average) | |
One Profile change with PROFILING PLUS | min (in average) | |
SAVINGS a day | 30 | min --> 150 h/Jahr |
Bottle neck efficiency | ||
Savings a year | 39.750 | €/a |
Developments - Innovations & Events with SMT Wertheim